Rear extension built from ground up
Roofing works flat roof (3 layer felt) inc. mushroom for ventilation
Structural works supplied and installed
Cavity walls erected including reinforced retaining wall to neighbour side
30min fire board installed around steel works
Dot and Dab insulated plasterboard and skimming
Engineered wood flooring installed
All electrics supplied and installed (client supplied pendants)
Glazing
Installation of rooflights
New boiler system installed
Wet room refurbishment/creation
Kitchen installation
External Paving including sub-base, levelling and steps tiled
Installation of floor and wall tiles
External retaining wall for planters
Aco-drain/French drain channel supplied and installed