Scardale House, E5 2 Bed flat refurbishment – London

  • Removal and disposal of bathroom, WC room, Kitchen and Flooring throughout…including all white goods and cabinets.
  • The installation of all white goods in kitchen, WC room and Kitchen, plus Engineered wood flooring throughout (plus underlay)
  • Minor 1st fix plumbing adjustments and 2nd fixes of the rooms worked upon throughout
  • Built in appliances and new cabinets installed in kitchen plus natural stone flooring.
  • All walls and ceilings in designated areas wiped down, sanded and painted plus natural stone installation (and supply)
  • Bespoke mirror (screw less) supplied and installed
  • Chasing of existing pull string light switch removed and chased so normal flick switch outside of bathroom and inside WC