Orpington, Side extension and refurbishment – Bromley BR5

  • Excavations
  • Drainage works
  • Reinforced new party wall with steel rods, blocks then filled with concrete to act as retaining wall (tanked also)
  • Below and above DPC Brickwork
  • Roof structure (mixture of flat and pitched rood for planning permission)
  • Steels supplied and installed
  • Roof coverings inc. fibreglass
  • Partitions and drylining
  • First & second fix electrics, plumbing, heating and mechanical
  • Pocket door systems
  • Glazing including pyramid rooflight
  • Plastering
  • Flooring – Herringbone engineered wood flooring
  • Kitchen installation
  • Worktop supply and installation
  • Decorating