Rear extension built from ground up
Combined roofing works pitched (tiles) and flat roofing (felt) within one roof
Steel works supplied and installed
Cavity walls erected
FD30 Fire doors installed
30min fire board installed upon ceilings and stud walls
Dot and Dab plasterboard and skimming
Engineered wood flooring installed
All electrics supplied and installed
Hard Landscaping undertaken and completed
Glazing supply and installation
Radiators installed
New boiler system installed
New shower room created, tiled and all sanitaryware installed
Misc items such as kitchen cupboards, shelves, ladder for access to secret storage area and bar worktop with serving window.